All articles

How to Combine Workshop and Storage Premises Under One Roof

Editorial Team · 4 November 2026 · how-to

Share on LinkedIn
How to Combine Workshop and Storage Premises Under One Roof

Last Updated: 4 November 2026

Quick Summary

To combine workshop and storage premises, find one mixed-use unit that covers both your making space and your stock, then confirm its permitted use covers both activities. Check the planning class, insurance and total cost of occupation before you sign, and plan a layout that separates delivery, storage and bench zones.

  • Measure your floor area, storage volume, power, water and access needs in writing before viewing any unit.

  • Confirm in writing whether the unit holds Class B2, B8 or a mixed consent covering your processes.

  • Tell your insurer exactly what you will store and which processes you will run to avoid voiding cover.

  • Compare total cost of occupation over three years, not headline rents, including one-off fit-out.

  • Check roller shutter opening height against your tallest vehicle and confirm the shutter is secure.

Table of Contents

Why Combining Workshop and Storage Premises Saves Time and Money

Combining workshop and storage premises means running your making space and your stock under one roof, so people, tools and materials stop travelling between sites. Moving from a lock-up plus a rented garage into one mixed-use unit can shorten the working day. Splitting the two can mean paying twice for rent, business rates and insurance. It also costs you time you never bill for.

Step 1: Define Your Space, Access and Utility Needs

Start with a written list before you view anything. Measure what you actually hold, not what you think you hold.

  • Floor area: the footprint of your largest machine or bench, plus clear working space around it

  • Storage volume: shelving runs, pallet positions and racking bays you need now, plus room to grow

  • Power: single or three-phase supply, and how many sockets your equipment needs

  • Water and drainage: essential for wash bays, clinics and food handling

Be honest about the growth figure. A common mistake is sizing to today's stock and running out of room within a year.

Matching Premises Types to Your Business

Different trades need different shells, and the wrong type costs you in fit-out. A workshop and storage unit on an industrial estate suits makers, tradespeople and light manufacturing best. A micro-warehouse fits e-commerce sellers with low staffing. A shared workshop reduces cost but limits your hours and security. You can browse units on Florence Road Business Park to see the range of sizes and specifications against your own list.

Step 2: Choose a Location That Handles Deliveries and Customers

Location decides whether your day runs smoothly or fights you. Two questions settle most of it: can a delivery lorry turn in and out without blocking the road, and can a customer find you without a phone call?

A unit just off a main route handles both. Our location information sets out the transport links and access arrangements so you can judge the delivery route before you commit.

Step 3: Check Planning, Permitted Use, Insurance and Safety

Permitted use is the planning category that says what a unit may be used for, and it is the first thing to confirm before signing. In England, the Town and Country Planning (Use Classes) Order 1987 (as amended) sets out the classes; the two that matter most here are Class B2 (general industrial) and Class B8 (storage or distribution).

Watch out: a landlord's assurance that "others have done it" is not a planning permission. Get the answer from the planning authority, not the letting agent.

The compliance checks to run before you sign

Work through this list in order, because each item can stop the others:

  • Planning and use class: confirm B2, B8 or a mixed consent that covers both your making and your storing. Check any conditions attached to the consent, opening hours, noise limits and delivery times are commonly restricted.

  • Building Regulations: any fit-out that changes the structure, adds a mezzanine, alters drainage or installs new electrical circuits needs to comply. Ask whether previous works had building control sign-off.

  • Fire safety: under the Regulatory Reform (Fire Safety) Order 2005, the responsible person must carry out a fire risk assessment (Responsibility for fire safety). Check escape routes, extinguisher provision, signage and whether the unit shares a fire alarm with neighbours.

  • Electrical safety: confirm the supply is tested and the consumer unit is labelled. PAT testing of portable equipment is a separate duty.

Health and Safety in Shared Workshops

Health and safety in shared workshops needs clear written rules, not assumptions. Agree who inspects what, how waste is removed, and which areas are off limits. Keep walkways clear, store flammable liquids in a proper cabinet, and put a named person in charge of checks. A shared space works well when everyone knows the boundaries. It fails when nobody owns them.

Step 4: Work Out the Total Cost of Occupation

Rent is not the cost of the space. The total cost of occupation is rent plus business rates, insurance, utilities, fit-out, racking, security and any service charge. Add a figure for the time your team loses travelling between two sites if you stay split. Then compare that total against a single unit. Pricing depends on the size and terms of each unit, so request a full breakdown and a quote from Florence Road Business Park.

 [Book a viewing →](https://florenceroadbusinesspark.com)

The cost lines to put in your comparison

Build a simple spreadsheet with one column per candidate unit and these rows:

  • Rent: quoted per square foot or per square metre per annum, usually payable quarterly in advance. Check whether VAT is charged and whether it is recoverable.

  • Business rates: calculated by the Valuation Office Agency from the rateable value and the multiplier set annually by central government. Small business rate relief may apply, so check eligibility before you assume the full bill (Business rates relief: Small business rate relief). Rates are payable even when the unit is empty in some circumstances, so ask about empty-property relief.

  • Service charge: covers shared estate costs such as lighting, landscaping, security and repairs to common parts. Ask for the last three years' actual figures, not just the current estimate, and check what is and is not included.

  • Insurance: buildings insurance is often recharged through the service charge; contents, stock and public liability are yours. Get a quote before you commit, because workshop use and stored goods can price very differently.

  • Utilities: electricity, gas, water and drainage. Three-phase power and high-draw equipment change the bill materially, so ask for the supply capacity and the meter arrangement.

Watch out: a service charge estimate that looks low in year one can jump once actual costs are reconciled. Ask for the history.

Comparing a split site against a combined unit

If you currently run a lock-up plus a garage, add up both rents, both rates bills, both insurance premiums and the travel time between them. A combined unit may reduce cash costs and time lost between sites, depending on your circumstances. Put the two totals side by side, including the one-off fit-out, and compare over a three-year horizon rather than month one, because the fit-out is recovered over time.

Build your comparison around these cost lines, all of which sit inside the total cost of occupation.

Cost line | What it covers | Note |

Rent | Quoted per square foot or square metre per annum | Usually payable quarterly in advance; check VAT |

Business rates | Calculated from rateable value and annual multiplier | Small business rate relief may apply |

Service charge | Shared estate costs such as lighting, landscaping, security, common parts | Ask for last three years' actual figures |

Insurance | Buildings often recharged; contents, stock and liability are yours | Workshop use and stored goods price differently |

Utilities | Electricity, gas, water and drainage | Three-phase power changes the bill materially |

Deposit and guarantee | Commonly three to six months' rent | Sometimes backed by a personal guarantee |

Fit-out and racking | Flooring, lighting, benches, shelving, pallet racking, security | One-off costs that land before you earn |

Security and access | CCTV, alarms, shutter maintenance, out-of-hours access | Check if charged separately |

Step 5: Plan Your Layout and Mixed-Use Commercial Space Planning

Good mixed-use commercial space planning separates movement from work. Draw the unit to scale on paper and mark three zones: delivery and dispatch near the shutter, storage along the walls, and the bench or clinical area in the quietest corner.

Tradesperson marking out floor zones in a workshop and storage premises with shelving and a central workbench

Storage Systems, Shelving and Workbench Zones

Storage systems earn their cost when they match what you hold. Use boltless shelving for boxes, pallet racking for bulk stock, and drawer units for small parts. Keep the workbench zone free of stock: the bench is where work happens, not where things get dumped. Wall storage and cabinets keep tools off the floor and out of the way. A simple test: if you have to move something to reach something else, the layout needs work.

Step 6: Prioritise Workshop Units With Roller Shutter Access

Roller shutter access lets you load directly from a van or lorry into the unit. It also makes deliveries quicker and keeps the weather out when you are moving stock. For workshop units with roller shutter access, check the opening height against your tallest vehicle and confirm the shutter is secure when closed. You can review what the park offers to see the access and facilities on site.

Book a Viewing and Walk the Unit Before You Sign

Walk the unit before you commit, and take your list with you. Measure the door height, test the shutter, check the power supply and pace out your planned zones. Visit at a busy time to see how deliveries and parking work. A viewing answers questions no brochure can. Contact the team to arrange a visit and talk through the unit that fits your work.

Frequently Asked Questions

Can I legally run a workshop from a standard storage unit?

Not automatically. A storage unit's permitted use may only cover storage, so working, running machinery or receiving customers can need a change of use or planning permission. Before signing, ask the landlord what the unit is consented for and check with the local planning authority. You also need to confirm the lease allows your activities, that insurance covers them, and that fire safety, ventilation and electrical arrangements suit the work you plan to do.

How do I organise a small workshop and storage premises so both functions fit?

Split the floor into clear zones rather than mixing everything together. Put storage along walls and in the least accessible corners, keep the workbench and machinery in the best-lit area, and leave a marked route from the roller shutter door to the bench. Use vertical space with shelving and drawer units, and keep frequently used tools on wall storage near the bench. Mixed-use commercial space planning works best when deliveries, work and dispatch each have their own path through the unit.

What are the benefits of workshop units with roller shutter access?

Roller shutters let you move materials, machinery and equipment in and out without lifting or dismantling anything, which matters for tradespeople and light manufacturing. They also improve security when locked and make deliveries quicker because pallets can go straight to the storage zone. Check the opening height and width against your tallest vehicle and largest item before committing, and confirm the shutter is included in the security arrangements alongside CCTV and site access control.

What fire safety and ventilation rules apply when combining workshop and storage areas?

Storing flammable materials, paints, solvents or dust-generating work increases the risk in a combined unit. You need a fire risk assessment covering both the workshop and storage zones, clear escape routes, suitable extinguishers and safe separation of flammables. Ventilation must remove dust, fumes and spray mists from the work area, and any extraction or LEV system needs regular inspection. Confirm with the landlord what the unit's fire strategy allows before you move hazardous stock in.


The real test of a combined unit is whether it makes your working day simpler. If you are still moving stock between two sites, you have not solved the problem yet. At Florence Road Business Park we offer mixed-use units from 275 to 6,000 sq ft, with roller-shutter access, CCTV security and on-site parking, near Callington just off the A388. Get started with Florence Road Business Park and bring your workshop and storage together under one roof.

[Book a viewing](https://florenceroadbusinesspark.com)
how-to

Ready to see your next space?

Viewings are strictly by appointment. Tell us what you need and we'll arrange a look round.

Book a viewing